CONSTRUCTION OF FLYOVER
| No of Views |
112
|
No of Downloads
|
1
|
Designation:
Divisional Superintendent, Pakistan Railway, Multan. (Divisional Signal Telecom Engineer-I)
Department
Divisional Superintendent, Pakistan Railway, Multan. (Divisional Signal Telecom Engineer-I)
Details
Construction of flyover at km no.88/6-8 in replacement of level crossing no. 50-a between SSH-MUL stations on LON-MUL (VIA LOOP) section. No. 27-SIG/MUL/2022