PREPARATION OF DESIGN REPORT
| No of Views |
35
|
No of Downloads
|
Not Available
|
Designation:
Dy: Chief Electrical Engineer/Incharge
Department
Chief Electrical Engineer/Incharge
Details
Preparation of design reports after survey for external electrification of Pakistan Railways residential colonies under the jurisdiction of DISCOs.