| Description |
Opening Date |
Closing Date |
P.R DS RAWALPINDI W.M/D
Department: DS RAWALPINDI W.M/D
Sealed tenders are invited for the purchase of Elbow Piston Cooling and Elbow Assy.
View Details
|
20 April, 2017 |
08 May, 2017 |
P.R DS RAWALPINDI W.M/D
Department: DS RAWALPINDI W.M/D
Sealed tenders are invited for the purchase of Elbow Stainer and Elbow pipe Seavenging.
View Details
|
20 April, 2017 |
08 May, 2017 |
P.R CHIEF CONTROLLER OF PURCHASE
Department: CCP/HQ
Procurement of Spare Parts of Diesel Electric locomotives.
View Details
|
20 April, 2017 |
01 June, 2017 |
P.R CHIEF CONTROLLER OF PURCHASE
Department: CCP/HQ
Corrigendum (Diesel Generating Set 20 KVA with Misc Tender S.NO 1 to 7) Sr No 1. has been changed.
View Details
|
20 April, 2017 |
25 May, 2017 |
P.R MANAGING DIRECTOR /CF/ISLD
Department: MD/CF/ISLD
Speaker & Coolent pump with Electric Motor.
View Details
|
19 April, 2017 |
09 May, 2017 |
P.R DS LAHORE
Department: DS LAHORE
Tender are invited for fumigation of Ac coaches, dinning cars and saloons for the period of one year.
View Details
|
19 April, 2017 |
07 May, 2017 |
P.R DS QUETTA
Department: DS Quetta
Supply of Common user items.
View Details
|
19 April, 2017 |
02 May, 2017 |
P.R DS QUETTA DME
Department: DS QUETTA/DME
Tender are invited for Misc: items.
View Details
|
18 April, 2017 |
16 May, 2017 |
P.R CHIEF CONTROLLER OF STORES
Department: CCS/HQ
Tender are invited for Misc: items.
View Details
|
18 April, 2017 |
09 May, 2017 |
P.R MANAGING DIRECTOR /CSF/LHR
Department: MD/CSF/LHR
High Tensile steel wire cold drawn 10 mm dia as per specification required for CSF/Sukkur & Khanewal.
View Details
|
18 April, 2017 |
10 May, 2017 |
P.R MANAGING DIRECTOR /CSF/LHR
Department: MD/CSF/LHR
Tender are invited for Misc: items.
View Details
|
18 April, 2017 |
11 May, 2017 |
P.R MANAGING DIRECTOR /CSF/LHR
Department: MD/CSF/LHR
Tender are invited for The procurement of different material.
View Details
|
18 April, 2017 |
08 May, 2017 |
P.R DS WORKSHOPS/MGPR
Department: DS Workshops/Mgpr
Special repair of Officer Bungalow & Misc items.
View Details
|
18 April, 2017 |
03 May, 2017 |
P.R DS SUKKUR
Department: DS SUKKUR
Provision of 5 Nos Air Conditioners 18000 BTU.
View Details
|
18 April, 2017 |
29 April, 2017 |
P.R DS SUKKUR
Department: DS SUKKUR
Provision of 5 Nos Air Conditioners 18000 BTU.
View Details
|
18 April, 2017 |
29 April, 2017 |
P.R DS MULTAN DEN-II
Department: DS MULTAN DEN-II
Supply and Fixing of R.C.C mosaic benches .
View Details
|
18 April, 2017 |
04 May, 2017 |
P.R DIRECTOR IT
Department: DIT/HQ/LHR
Corrigendum (PROVISION INSTALLATION, OPERATIONS, MAINTENANCE AND SUPPORT OF TRACKERS, NAVIGATION SYSTEM WITH SPEED OF LOCO, RFID READERS, RFID TAGS, VIDEO WALL, ALERT/ WARNING SYSTEM ALONG WITH CUSTOMIZED SOFTWARE FOR THE MONITORING OF TRAINS).
View Details
|
18 April, 2017 |
03 May, 2017 |
P.R DIRECTOR IT
Department: DIT/HQ/LHR
Tender documents and amendments (Trackers, RFID, Video Wall, Alert/ Warning System).
View Details
|
17 April, 2017 |
03 May, 2017 |
P.R WORKS MANGER/DIESEL/CDL/WORKSHOP/RWP
Department: WM/D/CDL/RWP
Tender are invited for Pipe Stainer at Rawalpindi.
View Details
|
17 April, 2017 |
17 April, 2017 |
P.R DS LAHORE
Department: DS LAHORE
Construction of 2*17-1-3/4 R.C.C Box Culvert underpass between Lahore and Badami Bagh.
View Details
|
17 April, 2017 |
04 May, 2017 |
P.R MANAGING DIRECTOR /CF/ISLD
Department: MD/CF/ISLD
Corrigendum( PVC Insulated , PVC Sheathed Single Core Conductor Cable and Stone Wool Mat etc (TNO 1 to 2))
View Details
|
15 April, 2017 |
02 May, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Tender are invited for Exide Battery.
View Details
|
15 April, 2017 |
05 May, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Tender are invited for Misc: items.
View Details
|
15 April, 2017 |
17 May, 2017 |
P.R PROJECT DIRECTOR TWS RAILCOP
Department: PD/TMS/LHR
Sealed tenders are invited for procurement of Machines /steel material etc.
View Details
|
15 April, 2017 |
04 May, 2017 |
P.R CTM DRY PORTS
Department: DY: CTM/DP/LHR
Installation and operation of Weigh Bridge at Lahore Dry Port (Moghalpura) for a period of ten years.
View Details
|
15 April, 2017 |
08 May, 2017 |
P.R PROJECT DIRECTOR 100 DE LOCOS
Department: PD/100 DE Locos
Corrigendum (Procurement of spare parts for different classes of Diesel electric Locomotives).
View Details
|
15 April, 2017 |
25 May, 2017 |
P.R DS WORKSHOPS MUGHALPURA
Department: PEM/W
Sealed Tenders are invited for the purchase of Bevel Gear, Brake Head and misc. items etc
View Details
|
14 April, 2017 |
27 April, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Special Repair to Block No. 261-B in Westridge Colony in the Section of IOW-II/RWP
View Details
|
14 April, 2017 |
26 April, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Special Repair to Block No.113-B in Westridge Colony in the Section of IOW-II/RWP
View Details
|
14 April, 2017 |
26 April, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Special Repair to Quarter No.724-C in CDL Colony in the Section of IOW-II/RWP
View Details
|
14 April, 2017 |
26 April, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Distempering, Whitewash and painting Work in W.A. Drawing and Other Branches of DS Office RWP.
View Details
|
14 April, 2017 |
26 April, 2017 |
P.R DS RAWALPINDI
Department: DS RAWALPINDI
Special Repair to Block No.242-15 in LOCO Colony in the Section of IOW-II/RWP
View Details
|
14 April, 2017 |
26 April, 2017 |
P.R CHIEF CONTROLLER OF PURCHASE
Department: CCP/HQ
Sealed bids are invited for misc tenders S.No 1 to 7
View Details
|
13 April, 2017 |
16 May, 2017 |
P.R PROJECT DIR, 585 HCHW & 20 BRAKE VANS
Department: PD 585 Brake Vans
Sealed tenders are invited for oxygen Gas, Dissolved Acetylene Gas, Carbon Dioxide Gas, etc S.No 1 to 3
View Details
|
13 April, 2017 |
05 May, 2017 |
P.R DS LAHORE
Department: DEN-I/LHR
Provision of Class-1 Level Crossing No 52 at KM 54/4 at Baddomalhi Station yard on Shahdara Bagh - Narowal Station
View Details
|
13 April, 2017 |
04 May, 2017 |
P.R DS MULTAN
Department: DEN-II/MUL
Supply and Fixing of RCC Mosaic Benches 6 ft long etc.
View Details
|
13 April, 2017 |
04 May, 2017 |
P.R CHIEF CONTROLLER OF PURCHASE
Department: CCP/HQ
Corrigendum ( for S.No. 1 at tender ref: EC/CCP/0022-05/2017 has been cancelled).
View Details
|
13 April, 2017 |
15 April, 2017 |
P.R CHIEF CONTROLLER OF PURCHASE
Department: CCP/HQ
Corrigendum ( for EC/CCP/0023-07/2017 S.No 7) High performance Diesel Engine Oil
View Details
|
13 April, 2017 |
03 May, 2017 |
P.R DIRECTOR IT
Department: DIT/HQ/LHR
Corrigendum (Provision of Online Payment Processing Services)
View Details
|
13 April, 2017 |
20 April, 2017 |
P.R MANAGING DIRECTOR /CF/ISLD
Department: MD/CF/ISLD
Material required for Boge Shot Blasting Machine No.436 installed at Forge Shop/CF, Islamabad i.e Deri Radial Main Hydraulic Pump etc. = 17 items
View Details
|
12 April, 2017 |
03 May, 2017 |
P.R CHIEF MARKETING MANAGER LAHORE
Department: CMM/LHR
Out Sourcing of the Commercial Management of Khushhal Khan Khattak Express (19UP/20DN)
View Details
|
12 April, 2017 |
02 May, 2017 |
P.R DIRECTOR IT
Department: DIT/HQ/LHR
Corrigendum (MICROSOFT EXCHANGE SERVER LICENSE, MICROSOFT WINDOWS SERVER STD 2016 LICENSE, VMWARE VIRTUALIZATION LICENSE).
View Details
|
12 April, 2017 |
18 April, 2017 |
P.R DIRECTOR IT
Department: DIT/HQ/LHR
Procurement of IT& Networking Equipment.
View Details
|
12 April, 2017 |
28 April, 2017 |
P.R.EXECUTIVE ENGINEER/TRACK REHABILITATION
Department: EE/TR/KPR-LON
Hiring of three Caterpillar Wheel Loaders 155 HP.
View Details
|
12 April, 2017 |
26 April, 2017 |
P.R MANAGING DIRECTOR /CF/ISLD
Department: MD/CF/ISLD
Locking Device & Door Lock = 04 items.
View Details
|
12 April, 2017 |
02 May, 2017 |
P.R PD/REHABILITATION OF 300 NOS TRACTION MOTORS RAWALPINDI
Department: PD/Rehabilitation of 300 nos/Rawalpindi
Corrigendum (Procurement of spare parts for Hitachi-395 Traction).
View Details
|
12 April, 2017 |
28 April, 2017 |
P.R PROJECT DIRECTOR/RSP
Department: PD/RSP/LHR
Construction of Equipment battery generator rooms etc at Pattoki, Changa Manga and Kot Rada Kisshan Stations.
View Details
|
11 April, 2017 |
28 April, 2017 |
P.R PROJECT DIRECTOR/RSP
Department: PD/RSP/LHR
Construction of Equipment battery generator rooms etc at Prem Nagar, Jia Bagga Stations.
View Details
|
11 April, 2017 |
28 April, 2017 |
P.R MANAGING DIRECTOR /CF/ISLD
Department: MD/CF/ISLD
Tender are invited for Misc: items (T No 1 to 5).
View Details
|
11 April, 2017 |
03 May, 2017 |
P.R MEDICAL SUPERINTENDENT/ HOSPITAL/MGPR
Department: MD/ MGPR Hospital Lhr
Supply of cooked diet food as per schedule to the indoor patients of the Railway Hospital Moghalpura.
View Details
|
11 April, 2017 |
25 April, 2017 |