| Description |
Date |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Installation of IP/MPLS Backbone with Microwave & Optical Fiber Transmission works. No. Tel-Proj/Tender/2025-26 (HBL 121221423980)
Download File
|
12 November, 2025 |
ANNUAL PROCUREMENT PLAN 2024-2025 (UNDER RULE 8 AND 9 OF THE PUBLIC PROCUREMENT RULES 2004)
Annual procurement plan for 2025-26
Download File
|
11 November, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Lenses Green. NO 20/0017/00/1-2024
Download File
|
07 November, 2025 |
P.R DIVISIONAL SUPERINTENDENT / RAWALPINDI
AEN (BS-17) Rawalpindi
Download File
|
28 October, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Upgradation of track on ML-3; Rohri – Sibi – Quetta – Koh-e-Taftan section No. 844-W/701/PC-II (Detailed Design – ML-3)/S&C/2025 (HBL 295558758)
Download File
|
21 October, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Outsourcing of operation & maintenance of Pakistan railways concrete sleeper factory at Sukkur Bid Reference No: 686-W/76/CSF/2025
Download File
|
16 October, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Outsourcing of operation & maintenance of Pakistan railways concrete sleeper factories at Khanewal Sukkur & Kohat Bid Reference No: 686-W/76/CSF/202
Download File
|
16 October, 2025 |
SHOW CAUSE NOTICE
Mrs. Zarish Pervez David, Staff Nurse, Cairns Hospital
Download File
|
14 October, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Power Supply No. 20/0016/00/1-2024
Download File
|
13 October, 2025 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Upgradation of track on ML-3; Rohri – Sibi – Quetta – Koh-e-Taftan section No. 844-W/701/PC-II (Detailed Design – ML-3)/S&C/2025
Download File
|
08 October, 2025 |