| Description |
Date |
P.R CHIEF PERSONNEL OFFICER-II
Notification: No. 940-E/1168-XII (APO-V)
Download File
|
17 November, 2023 |
P.R DEPUTY DIRECTOR COMPENSATION
Notification: No. Admn-IV/1993-P
Download File
|
17 November, 2023 |
P.R DEPUTY DIRECTOR /P&P
Notification: 1/7-Elect/2022/P&P
Download File
|
17 November, 2023 |
P.R DEPUTY DIRECTOR /P&P
Notification: No. 1/7-Elect/2022/P&P
Download File
|
17 November, 2023 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Rehabilitation of Track between Baruli and Sohan Bridge on Kundian Attock City Section (Peshawar Division Phase-1) No. 835-W/1425/1/RNIR-BKR/2023/Tender
Download File
|
15 November, 2023 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Executive Engineer, Rehabilitation of Track (BRLY-SON) Pakistan Railways, Lahore
Rehabilitation of Track between Rehmani Nagar and Bakrani Road on Dadu - Habibkot Section (Sukkur Division Phase-IV) No. 835-W/1424/1/RINR-BKR/2023/Tender
Download File
|
15 November, 2023 |
P.R DEPUTY DIRECTOR / P&D
Notification: No. 15/24-2/2021/A.I (P&D)
Download File
|
15 November, 2023 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
District Controller of Purchase P.R Carriage Factory, Islamabad
No. 2CF-4P-0789 -23 Hydraucil Oil =1 Items
Download File
|
15 November, 2023 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Managing Director / Assistant Controller of Purchase
Air Hose Pipe 02 items Tender No.3CF-4P-0798-C-2023
Download File
|
15 November, 2023 |
P.R TECHNICAL EVALUATION REPORT (AS PER RULE 35 OF PPRA 2004)
Managing Director / Assistant Controller of Purchase
Hexagonal Head Bolt etc 13 items Tender No.3CF-4P-0798-2023
Download File
|
15 November, 2023 |